December 26, 2020 https://youtu.be/3i2a7y9Hax4 The last time I'll ever be able to look "through" the table. Next stop...the top.
Finishing The Second Table
February 29, 2020 Using the same technique to add one of the four legs to the second table. Inserting one of the legs prior to bolting. The second table frame is complete. The second table frame, complete, has been placed next to the first frame where they will eventually be bolted together.
Miscellaneous Table 1 & Table 2 Shots
February 22, 2020 Here are some miscellaneous shots I took of both tables. Table 2 is coming along and table 1 has been moved closer to its final resting place next to the wall. Moving that big table was...interesting. Two legs done so far.
Table #2 Coming Along
February 16, 2020 I didn't chronicle a lot of this table's construction since it was identical to the first. The only difference was that the size of this one was half that of the first one. This one is 4X8 where the first one was 4X16. These two will eventually be bolted together to form... Continue Reading →